Portal Jadwal Training & Consulting, Sertifikasi dan Non-Sertifikasi

Primavera P6 Professional Fundamental

January 10, 2025

Primavera P6 Professional Fundamental

Jadwal Pelatihan Primavera P6 Professional Fundamental

TanggalTempatKota
22 - 23 Januari 2025Santika Pandegiling HotelSurabaya

 

OVERVIEW

Primavera Systems is a brand name under which a range of software packages that collectively form a comprehensive enterprise project portfolio management (EPPM) solution are marketed. Primavera was launched in 1983 by Primavera Systems Inc. and was acquired by Oracle Corporation in 2008.

Primavera P6 Professional is a Windows client project scheduling application that is installed on a user’s workstation. Much like any other Windows application, it is run from an executable file that resides on the workstation machine.

P6 Professional can be used as a standalone application accessing a locally installed database such as Oracle XE or Microsoft SQL Server Express. It can also access a central database and be used as a multi-user system when data needs to be shared with others.

P6 Professional is typically used in such industries as, Engineering, Construction, Aerospace, Defense, Utilities, Oil and Gas. P6 Professional is the preferred tool for power users such as schedulers and project managers in industries where detailed, fast, accurate scheduling and critical path method are vital elements for project planning, execution and success.

 

TUJUAN

  1. Understanding Project Management Principles
  2. Navigating Primavera P6
  3. Creating and Managing Projects
  4. Developing a Work Breakdown Structure (WBS)
  5. Scheduling Activities
  6. Resource Management
  7. Budgeting and Cost Management
  8. Risk Management

 

MATERI Training Primavera P6 Professional Fundamental

  1. Understanding P6 Data
  2. Enterprise Project Structure ,Describing Components of EPS
  3. Creating a Project
  4. Creating a Work Breakdown Structure
  5. Adding Activities
  6. Creating Relationships
  7. Scheduling
  8. Assigning Constraints
  9. Using Reflection Projects
  10. Formatting Schedule Data
  11. Roles and Resources
  12. Assigning Roles
  13. Assigning Resources
  14. Analyzing Resources , Displaying the Resource Usage Pro- file
  15. Optimizing the Project Plan
  16. Baselining the Project Plan
  17. Project Execution and Control
  18. Reporting Performance

 

TRAINING METHOD

Presentation

Discussion

Case Study

Evaluation

 

 

FACILITIES

Training Kit

Handout

Certificate

Lunch + 2x Coffee Break

Souvenir

 

 

Form Pre-Registrasi

Data Materi Training

Topik Training : Primavera P6 Professional Fundamental
Link
*Jumlah Peserta Estimasi Jumlah Peserta yang di ajukan
*Nama Peserta Yang Didaftarkan

Personal Data

*Nama
*Jabatan Jabatan/Divisi/Departement
*Nama Perusahaan
*Alamat Perusahaan
*Email Perusahaan
*Email Alternatif eg: gmail, yahoo, hotmail
*Telepon Kantor
Ekstensi
*Handphone
* Harus di isi
TAGS , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,